| Click on the picture to view larger |



| BEFORE |
| DURING |
| AFTER |
| Note the location of the boat before and after. |
| AFTER |
| Removed 8' of material from a 35' deep tank |
| Rags and Plastics Removed from Side Wall Diffusers. |
| Material removed from plant into rolloff containers. |
| Sand is being lime stabilized as it is deposited for site removal. |
| Material from Wastewater Treatment Plant being deposited into drying beds. |
| Material being stockpiled prior to being removed. |
| Small mobile home park in Ft. Myers, FL |
| Trucks and Equipment Do not Block Streets. |