
| City of Port Orange, Florida, Wastewater Lift Station Job Dates: 12/5/05 - 12/9/05, 12/19/05 - 12/22/05 Contact: Phillip Clark, Wastewater Superintendent (386) 756-5387 Removed Sand and Grit "Cleaning the plant while in operation was the most efficient way to achieve our objective with no down time." Phillip Clark, Wastewater Superintendent Veolia Water North America/City of Palmetto, Florida Job Dates: 10/31/05 - 11/15/05 Contact: Ray D’Aiuto, Project Manager (941) 723-6106 Removed Accumulated Settled Mass "Great Job!" Ray D’Aiuto, Project Manager Des Pinar Wastewater Treatment Plant Longwood, Florida Work Done June 10-19, 2002 Contact: Mr. Don Hasty, Supervisor (407) 260-5065 Removed accumulated sand and solids from one surge tank, two aeration tanks and one digester. "SSMI actually took out more sand and grit than we thought was there, and they took out additional rags to get under the diffusers. I was very satisfied." Don Hasty, Supervisor University of Florida, Physical Plant Gainesville, Florida Work Done August 15, 2002 - September 26, 2002 Contact: Mr. Chuck Fender, Utility Superintendent (352) 392-1103 Removed and replaced filter media from six filter cells at the wastewater treatment plant. "You can imagine the peak loads my filters have to handle with 85,000+ fans watching the Gators play at the Swamp come half- time. Settled Solids gave me a cost effective process to clean the filters and media without disturbing the plant process." Chuck Fender, Utility Superintendent City of Winter Springs Wastewater Treatment Plant Winter Springs, Florida Work Done July 22-27, 2002 Contact: Mr. Doug Taylor, Supervisor Removed the accumulated sand and solids from various tanks at the wastewater treatment plant. "Settled Solids crew did a great job, they exceeded our expectations and we were very pleased with the outcome." Doug Taylor, Supervisor |
| You could be our next satisfied customer. Click here for more information. |


